Friday, November 14, 2008

Important Prep Work

Scoff project under wraps awaiting the rain


We are still waiting for the batch of new 2x4s for the project, but in the meantime I've been busy preping and pre-building a few parts of the project for the build days so that they will go by smoothly. We've added an additional 4ft piece to the flat bottom of the ramp. We figured that the riders would need more time to setup to hit the ramp comfortably and we plan to fix a problem we had with the ramps tranny back in 2 day which we never mention but will be explain on film (theres a good reason for it.)

Next on top of that I've built the basic structure for the rollin to get it ready for us to haul up and drop in its post holes. It going to be really tuff. As a side project also we've started building a skatepark away from the mini mega ramp completely out of scrap wood and old ramps to show what amazing things you can build out of nothing and how to get the wood to do it. The park building will be in the extras of the DVD and we might drop a few photos on here when it nears its finish.

No comments: