Saturday, February 28, 2009

Day 13: Workin on the Second Half

February 28, 2009
Well today it was obvious we weren’t going to get all the builders together in one place for putting up the runway. So the prep work I did the week before setting up the landing bank was put to good use. We had a new young builder Rhett Renburg coming to help out a friend of our filmer Dan Stolling.
After grabbing a few Monsters we got to work. Rhett assisted me in leveling out the new flat bottom piece and along with the launch ramp which was sinking to one side likely the work of all the rain we’ve had lately. Rhett displayed his hulk skills today lifting some massive pieces so I could get pieced of wood under to help level the ramp out. Seriously though leveling may seem small but it is one of the most serious things to do and therefore takes a longtime to make sure everything is fine.




Next on the agenda was to rebuild some of the supporting structure for the launch ramp itself since we stripped it of its main 4x4 supports. We sawed off the additional wood that was left over, took out the 2x4s that were next and replaced them with the 4x4s we used before. Made sure the tip of the ramp was leveled and screw our cross braces in. It was funny and a bit serious at the same time. Rhett was holding the wood in placed while I screwed in a few 3inch screws to the 4x4 and we forgot the 6ft long level on the ramp……It came down hit the camera lens and Rhett on top of the head! Luckily the camera was fine and Rhett had a little red line on top of his head along with a good sized bump. All in all everything was fine and we continued building.
Before we moved on to start plying up the landing bank myself and Rhett tried chugging a MIXX Monster drink, we both fell half a can short of it all in one breath. An Rhett feeling empowered by his hulk skills lifting the ramps tried smashing the can using his forehead…..It didn’t go so well. We ended up putting 2 sheets up on the bank when the cameras battery ran out and the days light was getting darker. We decided what the hell! Lets have some fun and plyed the bank up just enough so we could ride down it onto one of the large runway pieces.

It was a fun treat just being able to ride a section of it and we got some serious speed off the bank also…Soon after the filmer and Rhett had to leave and we made plans for the next build day…Hopeful to attack the runway again and get some of it finished. After they left I took a break and continued on the bank screwing 2 additional sheets in. Still needs a full sheet at the bottom and a partial at the end.

For more photos of DAY 13 visit www.flickr.com/minimegaramp

No comments: