Friday, April 10, 2009

Giant Assembly

So basically today I assembled the giant support legs for the side of the rollin. Measuring 16ft long their like giant prongs, the purpose of these is to take stress off the back end where the majority of weight will be. I have 2 built for each side, I'm thinking I might need to get 2 in for the back end also.

They will connect to the 4x4 legs on the roll-in and then slant down and bolt into a 4x4 piece that's been concreted into the ground securing it all together.

No comments: